When the staircase within DESSA head office was under repair, our team installed a 15 tread RANGER Stair unit from the warehouse floor to our mezzanine floor. This provided essential access to the warehouse to ensure operations continued uninterrupted. This was installed and secured in 5 minutes by two operatives.


| Date: | September 2020 |
| Duration: | 1 week |
| Customer: | DESSA |
| Provision: | Design and Supply |
| System: | RANGER Stair |
| Variant: | 15 tread |