The client required a scheme that would allow access for bridge replacement works whilst maintaining operational railway lines below. DESSA designed the structure in Plettac Futuro and used a bank of Asterix HD beams (laced and braced in DESSA bracing kit for a lightweight span and quicker build) to span between towers over the railway. A full calculation package was provided along with detailed appraisal of loads due to passing trains.



| Date: | June 2020 |
| Duration: | 6 months |
| Customer: | BELTEK (Altrad Benelux) |
| Provision: | Design and Supply |
| System: | Asterix HD Beams |
| Length: | 28m |